Minutes of Site Inspection
LOCATION: Scott Werndorfer Application #19-06
5 Side Cut Road
DATE: October 20, 2019
TIME: 8:30 AM
PRESENT:
COMMISSION APPLICANT
D. Pattee
C. Matzke
T. Miller
W. Perlman
S. Robinson
The Commission inspected the area in the field where the proposed new septic system is to be installed. The ends of the system were not staked as requested. The Commission walked to the stone wall and saw the wetlands area beyond it.
The site inspection ended at 8:45 am.
Submitted by David Pattee
